Project Scope

This Measure E funded project will upsize or replace, as needed, utility and technology services to and around the existing north side of campus and will provide the necessary utility and technology infrastructure to new and renovated campus facilities. The infrastructure services include electrical service, low voltage (data) service, water service (potable and non-potable), sanitary sewer, and storm water systems. The natural gas infrastructure was recently replaced but will need to be extended to the planned new construction.

Learn more in an excerpt from the FY 2020-21 Rocklin Campus Facilities Master Plan Implementation Report (Q2)